9
$\begingroup$

Edit Jan 31: important special case is when the sums form a nested structure, search for "Hasse diagram is a tree" below

Here's a practically relevant variation on matrix chain problem:

Find optimal way to compute a sum over all weighted paths in a graph, where the weight of each path is the matrix product of edge labels (ie, a matrix chain)

For instance, take $Q$ corresponding to the sum of $$Q=A_0 A_1 A_2 A_3 A_4 +A_0 A_1 A_3 A_4 +A_0 A_1 A_4$$

We can represent it as the following sum over weighted paths

enter image description here

Now, we can count the number of matrix multiplications (in red) involved in computing this sum

enter image description here

Here's a more efficient way to compute $Q$

$$Q=A_0A_1(A_2+I)A_3A_4 + A_0A_1A_4$$

We can view it as following sum over paths: enter image description here

Some edges are labeled with I, corresponding to multiplication by the identity matrix.

Given a list of matrix dimensions $d_0,\ldots,d_n$ corresponding to matrices $A_0,\ldots,A_{n-1}$ and a list of paths, the task is to figure out a sequence of matrix multiplications and additions which produces $Q$ using the smallest total number of scalar multiplications.

Specifying Paths

Each term in the sum is specified as a pair of two numbers $(i,j)$, indicating that matrices $A_{i+1},A_{i+2},\ldots,A_j$ are not present in the term.

For instance, for problem above, paths are $[(), (1,2), (1,3)]$. The second term is missing matrices $\{A_2\}$ and the third term is missing $\{A_2,A_3\}$. Viewing paths as connected subgraphs of the chain graph, paths are partially ordered using subgraph relation. Therefore, the set of paths forms a lattice.

enter image description here

An important special case is when the Hasse diagram is a tree.

For example, consider this sum.

$$W=A_0 A_1 A_3 A_4 + A_0 A_1 A_2 A_4 + A_0 A_1 A_4 + A_0 A_1 A_2 A_3$$

enter image description here

And the corresponding Hasse diagram:

enter image description here

Coming back to original example $Q$, we can order matrix products in the following way: $$Q=(A_0 A_1) A_4 + (A_0 A_1) (A_3 A_4) + ((A_0 A_1) A_2) (A_3 A_4)$$

Notice that some terms like $A_0 A_1$ are repeated, hence reuse this computation by introducing temporary variables like $T_0=A_0 A_1$.

Now we can visualize a particular schedule below, and use this colab to find that it requires 7 scalar multiplications when $d_0=d_1=\ldots=1$

enter image description here

T0=matmul(A0, A1)
T1=matmul(T0,A4)
T2=matmul(A3,A4)
T3=matmul(T0,T2)
T4=add(T1,T3)
T5=matmul(T0,A2)
T6=matmul(T5,A3)
T7=matmul(T6,A4)
Q=add(T7,T4)

Now the question is -- how hard is this problem to solve or approximate:

  1. when $d_0=d_1=\ldots=d_n=1$
  2. when $d_i$'s are arbitrary positive integers

Edit Feb 17 Example of problematic split mentioned in the comments enter image description here

$\endgroup$
3
  • 2
    $\begingroup$ This probably doesn't help you at all, but you can skip T6 and do T7 = matmul(T5, T2) in your example $\endgroup$
    – Ordoshsen
    Jan 11, 2022 at 17:05
  • $\begingroup$ Also a question about what can be skipped - do the skipped subchains have to have anything in common or can every term have a completely different skipped part? The example makes it seem that each next term has the same subchain skipped as the previous term plus one more matrix. $\endgroup$
    – Ordoshsen
    Jan 11, 2022 at 17:45
  • $\begingroup$ @Ordoshsen good question....after examining the underlying problem some more I realized that skipped subchains have a structure. They can be arranged in a directed tree where A->B means that skipped subchain A is a subgraph of B, updated post $\endgroup$ Jan 22, 2022 at 20:04

1 Answer 1

3
+200
$\begingroup$

One idea would be to generalize the O(N^3) DP for the case of a single path without skips to your case:

d[i][j] would be the cost of computing all the products of matrices [A_i ... A_j) for all the paths for which all their missing matrices lie fully within the range. It can be done by iterating over a location to split the range [i, j), recursively computing the best cost for the left and the right part. If some subtree lies entirely on one side of the split point, then I believe it just works. If the split point is in the middle of some subtree (and there will be at most one such subtree), the DP needs to be called recursively for the subtree, and the result needs to be added to the cost.

Below I have the code, without the proper handing of subtrees. For your particular example if already improves from 7 to 6 multiplications.

...

def compute_schedule(tensors, paths, cache, l = 0, r = -1):
    if r == -1:
        r = len(tensors)
    
    if r == l + 1:
        return tensors[l], "A%s" % l

    if (l, r) in cache:
        return cache[(l, r)]
        
    ret = None
    for mid in range(l + 1, r):
        lm, ls = compute_schedule(tensors, paths, cache, l, mid)
        rm, rs = compute_schedule(tensors, paths, cache, mid, r)
        cur = [lm @ rm, "%s @ %s" % (ls, rs)]

        # If the Hasse diagram is a tree, the `mid` will lie within at most one
        # child. The correct thing to do here would be to call the DP for such 
        # subtree.
        # I don't do it here, and instead just compute the naive product from
        # left to right for all the runs in such subtree. This is not optimal
        # in general case.
        need_parens = False
        for path in paths:
            if l < path[0] and mid >= path[0] and mid < path[1] and r >= path[1]:
                t = tensors[l]
                ts = "A%s" % l
                for k in range(l + 1, r):
                    if k < path[0] or k >= path[1]:
                        t @= tensors[k] # don't actually need to multiply tensors here, enough to compute the shape
                        ts += " @ A%s" % k
                cur[0] += t
                cur[1] += " + %s" % ts
                need_parens = True

        if need_parens:
            cur[1] = "(" + cur[1] + ")"

        cur = tuple(cur)
        if ret is None or cost(cur[0]) < cost(ret[0]):
            ret = cur

    cache[(l, r)] = ret
    return ret


d = 1
ones = np.ones((d, d))
(A0, A1, A2, A3, A4) = (LeafNode(k * ones) for k in (1, 2, 3, 4, 5))
Q = A0 @ A1 @ A2 @ A3 @ A4 + A0 @ A1 @ A3 @ A4 + A0 @ A1 @ A4

Q2, Q2_str = compute_schedule([A0, A1, A2, A3, A4], [(2, 3), (2, 4)], {})
print(Q2_str)

np.testing.assert_almost_equal(Q.value, Q2.value)
assert cost(Q) == 9
assert cost(Q2) == 4
print(f"Schedule2 requires {cost(Q2)} scalar multiplications")

Yields

A0 @ ((A1 @ A2 + A1) @ A3 + A1) @ A4
Schedule2 requires 4 scalar multiplications
$\endgroup$
2
  • $\begingroup$ So it seems the following schedule is more efficient, requiring 5 multiplications: A0 @ ((A1 @ A2 @ A3 + A1 @ A3) + A1) @ A4. Also, I'm not sure the splitting strategy works here, the problems on the left and right are not independent, updated post with example for example of bad split for W, splitting ends up optimizing over paths not in the problem spec $\endgroup$ Feb 18, 2022 at 0:26
  • 1
    $\begingroup$ I haven't looked into the new examples yet, but the reason it was giving a suboptimal answer was a typo (it had if l < path[0] and mid >= path[0] and mid <= path[1] and r > path[1]: instead of if l < path[0] and mid >= path[0] and mid < path[1] and r >= path[1]:). With the fix it gives four multiplications: A0 @ ((A1 @ A2 + A1) @ A3 + A1) @ A4 $\endgroup$
    – Ishamael
    Feb 23, 2022 at 19:12

Your Answer

By clicking “Post Your Answer”, you agree to our terms of service and acknowledge that you have read and understand our privacy policy and code of conduct.

Not the answer you're looking for? Browse other questions tagged or ask your own question.